Electrical Engineering Laboratory Equipments
Electrical engineering lab equipment manufacturers in India are expected to equip several laboratories at once, from the first-year circuits bench to the final-year high voltage hall. Civil Mechanical India builds machine test sets, relay panels, impulse generators, solar trainers and SCADA models. Among suppliers in India we group them by laboratory so a department can order course by course.
The range is divided the way a university syllabus is. Basic electrical work needs multimeter, CRO, bench power supplies and a soldering station. Machines labs use a DC shunt motor and generator set, single phase and three phase induction motor loading with a brake dynamometer, a synchronous alternator panel and a percentage biased differential relay for protection studies.
High voltage work involves a test transformer, an impulse generator, a 10 kV DC supply, sphere gaps and an oil breakdown test set. Renewable energy covers PV characteristics, a grid-tie inverter, a wind turbine trainer, a solar water heater and a hydrogen fuel cell. The SCADA section links PLC, RTU and process models to a computer station for supervisory control teaching.
Last updated: November 2026
Electrical Engineering Lab Equipment range by function
How is this different from Electronics Training System?
Electrical engineering equipment deals with power: motors, generators, transformers, protection relays, high voltage and solar systems, usually on 230 V or 415 V supplies and with loading arrangements. An electronics training system works at signal level with low-voltage circuit boards, logic and digital trainers. A college normally needs both, but they sit in different laboratories with different safety rules and power points.
See also: Electronics Training System
Full Electrical Engineering Lab Equipment product list
The complete Electrical Engineering Lab Equipment range (30 products), in alphabetical order:
Specifications and standards
How do we plan an electrical department order across several labs?
List each laboratory against the syllabus experiments first, then match the equipment: machines lab sets need 415 V three phase points with proper MCBs, high voltage units need a separate room with earthing, and SCADA stations need computers. Ask the maker to number each trainer against its experiment list so the university inspection team can check it.
What should be checked on machine and high voltage test sets?
For machine sets confirm kW rating, meter accuracy class, brake or rheostat loading and the protection against overload. For high voltage units check output voltage in kV, whether the set has a discharge rod, interlocked door or cage, and the electrode standard for oil testing, which follows IEC 60156. Request the earthing details and operating manual before ordering.
Who buys Electrical Engineering Lab Equipment?
Engineering colleges and polytechnics buy the full range when setting up or upgrading electrical departments, while universities and training centres order laboratory by laboratory. Utilities, power sector institutes and technical schools take machines, relays and high voltage sets. Orders often include basic measurement benches, machine sets and SCADA stations in one purchase.
Related ranges
Frequently asked questions
Which experiments can the induction motor load test set perform?
The set supports no-load and blocked-rotor tests and load tests with a brake dynamometer, from which students plot speed, torque, current and efficiency curves and draw the equivalent circuit.
What is the standard for oil breakdown voltage testing?
Transformer oil breakdown voltage is commonly tested to IEC 60156, using prescribed electrodes, a set gap and a steady voltage rise rate. Our oil test sets follow that method.
Can the solar and wind trainers run indoors?
Solar kits can use a built-in lamp source for indoor use or run in sunlight on a rooftop. The wind turbine trainer uses a fan so that blade pitch and output can be studied without wind.
Does the SCADA trainer need special software?
The trainers come with SCADA software installed or supplied for a PC, along with a PLC or RTU unit. Tell us the operating system and number of workstations so that licences and cables are included.
Do you supply electrical lab equipment for government tenders or export?
Yes, we respond to tender schedules and also ship to institutions abroad. For export, mention the mains voltage and frequency, as 50 Hz and 60 Hz machines need different arrangements.
Request a tender quotation
As established manufacturers and suppliers for tender requirements from India, we undertake civil laboratory and industrial testing tenders as well as bulk and OEM supply of mechanical engineering and testing laboratory equipment. Please forward your tender specifications and our team will prepare a detailed quotation for Electrical Engineering Lab Equipment.
- Civil laboratory & industrial testing tenders
- Mechanical engineering & testing lab equipment
- Bulk and OEM supply